A-03.B1 · Shingle Roofing

Shingle roofs,
installed
properly.

Architectural asphalt · 2–3 day install

The most common roof in America, and the one most often installed badly, because it is forgiving enough to hide poor workmanship for about a decade.

A-03.B1.1

Why shingle,
and when not

Architectural asphalt shingle is the sensible default for most pitched residential roofs: reasonable cost, wide choice of profile and colour, straightforward repair, and a service life that is well understood.

It is not always right. Very low pitch roofs need a different system entirely. Structures already framed for tile may be better served staying with tile. And in full Inland Empire sun, the underlayment and ventilation specification matters more than the shingle brand on the box.

Where shingle roofs fail early it is almost never the shingle. It is flashing at valleys, walls and penetrations, and it is an attic that cannot breathe.

Completed architectural shingle roof
A-03.B1.2

What a proper
shingle install
includes

The parts you cannot see once it is finished are the parts that decide how long it lasts.

  1. 01

    Full tear-off

    Down to the deck. Layering new shingles over old is permitted in some circumstances and is almost always a false economy — it hides deck condition, adds load, and shortens the life of the new covering by trapping heat.

  2. 02

    Deck repair

    Rot, delamination and failed fastening found and documented once the deck is exposed, priced as a written change order before replacement goes in.

  3. 03

    Underlayment

    Specified for heat and UV exposure rather than to the cheapest product that satisfies the minimum. In this climate underlayment is doing more work than most homeowners realise.

  4. 04

    Flashing and detailing

    Valleys, wall intersections, chimneys, vents and pipe penetrations. This is where roofs leak and where corners get cut, because none of it is visible from the ground when finished.

  5. 05

    Ventilation

    Intake and exhaust balanced so the attic can move air. An unventilated attic cooks the roof from underneath and voids most manufacturer warranties.

A-03.B1.3

Common questions

Manufacturer ratings assume proper installation and adequate ventilation. In sustained high heat with a poorly ventilated attic, real service life comes in well short of the rating on the wrapper. Ventilation is the variable most within your control.
It is sometimes permitted, and we generally advise against it. It conceals the deck condition, adds weight, traps heat, and makes the next replacement more expensive. We will quote it if you want it and tell you plainly what you are giving up.
On a typical single-family re-roof, tear-off and dry-in happen the same day, so the structure is weather-protected each night. Install and detailing follow over the next day or two.
Two separate things: a manufacturer warranty on the material, and a workmanship warranty from us on the installation. Our standard workmanship warranty is 2 years from the date of completion. Manufacturer material warranties vary by product and are passed through to the homeowner.

A-03.B1.4 · Free, no obligation

Get a real number
in writing

Site visit within 48 hours, itemized estimate after. No deposit, no pressure, and no salesperson — you'll be talking to the people who'll do the work.

Request my estimate Call (626) 922-9105
CSLB #700519 · Bonded · Insured
Call now Free estimate